THE RATIONALE BEHIND THE INNOVATIVE TECHNOLOGY OF ASH
Multiple Problems Faced by Spinners during the Yarn Marketing Process:
- Sliver lifting with 500 Gram deflection, Sliver below Top Ring of can by 6” /
7”
- 2” / 3” Tilting, Sliver stretch with can body
-
During Sliver unwinding process, breakage in simplex grill and Sliver thick &
thin
problem.
-
Breakage in simplex grill, Sliver wastage and Sliver damage
-
Improper sliver coiling due to can ovality; damages first layer of sliver.
-
Sliver accumulation at D/F machine Top Roll area, and machine stoppages more.
-
Regular Spring and Top Plate will not be at Center of the Can. Will not maintain
equal
gap between Top Plate and Top Ring.
-
Regular Castore in Cans, manpower required for cleaning, Castore Jamming
problem.
/ because retention of sliver parameters
during
the
yarn making process, is affected by multiple factors